Bid Documents
All bidders are responsible for reviewing the complete set of bid documents. Only documents posted here or issued via addendum are considered part of the procurement.
Available Documents
- Project Manual (PDF)
- Architectural Drawings (PDF)
- Civil Drawings (PDF)
- Structural Drawings (PDF)
- MEP Drawings (PDF)
- Geotechnical Report – Yeh & Associates
- Preliminary Project Schedule
- NEPA / Environmental Documentation (as applicable)
Document updates will be issued only through formal addenda.